by Control Hire | Oct 20, 2026 | Case Studies
Control Hire engineered a four fan, four scrubber system to cool and filter exhaust from a 750hp diesel dewatering pump deep underground at a sewage treatment plant, with gas monitoring to confirm the air met WorkSafe exposure standards.
by Control Hire | Oct 20, 2026 | Case Studies
Control Hire designed a ventilation and filtration system for a client’s basement shotcreting works, sectioning the basement, sweeping clean air across the work zone and fitting each worker with a personal dust monitor to prove exposure was controlled.
by Control Hire | Oct 20, 2026 | Case Studies
Control Hire installed its Noise Control Wall to split the Victory Room at Marvel Stadium in Melbourne, so the client could run an exhibition and a conference lunch side by side.
by Control Hire | Aug 26, 2026 | Articles
Control Hire PID Detector, 5 in 1 Gas Monitor
by Control Hire | Jul 31, 2026 | Case Studies
“The enclosure was purpose-built to create a controlled testing environment while remaining practical for animal welfare and daily research operations.”